فایلوو

سیستم یکپارچه همکاری در فروش فایل

فایلوو

سیستم یکپارچه همکاری در فروش فایل

(فونداسیون)Parking Structure Foundation Pour Schedule Dec 10

Parking Structure Foundation Pour Schedule Dec 10
Parking Structure Foundation Pour Schedule Dec 10 - (فونداسیون)Parking Structure Foundation Pour Schedule Dec 10



Parking Structure Foundation Pour Schedule Dec 10
The second major concrete foundation pour for the multilevel parking structure on the Santa Rosa Campus is scheduled for this
Saturday, December 10 from 7 AM to 7 PM. The same protocols and access restrictions are in place as they were last week to
ensure a successful activity.
It is still advisable, unless you have classes or business on the Santa Rosa Campus, to avoid accessing the college from
Mendocino Avenue, especially between Elliott Avenue and Ridgeway. We still anticipate considerable congestion between
Steele Lane and College during the construction hours, though it was managed very well last week.
Contractors, engineers, and college staff alike are very pleased with the significant and positive interest in this particular
project, and find that there’s a very active interest in the excavation work and foundation pours. The safest place to view
the construction activity of the parking structure is from the top of the east bleachers at Bailey Field looking down at the
construction site. This project is a real team effort, and we are quite pleased by the performance of our contractor, Wright
Contracting, Inc., and their subcontractors.

مشخصات فروشنده

نام و نام خانوادگی : علیرضا خشاوه پور

شماره تماس : 09357717947 - 05137573265

ایمیل :info@cero.ir

سایت :cero.ir

مشخصات فایل

فرمت : doc

تعداد صفحات : 8

قیمت : برای مشاهده قیمت کلیک کنید

حجم فایل : 33 کیلوبایت

برای خرید و دانلود فایل و گزارش خرابی از لینک های روبرو اقدام کنید...

پرداخت و دانلودگزارش خرابی و شکایت از فایل
نظرات 0 + ارسال نظر
امکان ثبت نظر جدید برای این مطلب وجود ندارد.